
Cost of Trench Backfilling in Lenoir City
Trench backfilling is a crucial step in many construction and landscaping projects in Lenoir City, TN. This process involves filling a trench with soil or other materials after utilities, pipes, or cables have been laid. The cost of trench backfilling can vary significantly based on several factors, including the type of material used and the complexity of the project.
Factors Affecting Cost
- Material Type: Different materials like sand, gravel, or native soil can have varying costs.
- Trench Depth and Length: Deeper and longer trenches require more material and labor.
- Labor Rates: Local labor costs can influence the overall price.
- Equipment Needed: The type of machinery required can add to the cost.
- Site Accessibility: Hard-to-reach sites may incur additional charges.
- Permit Fees: Local regulations may require permits, adding to the cost.
- Disposal Fees: Removing excess material can also affect the total cost.
Average Costs for Common Tasks
Task | Average Cost (Lenoir City, TN) |
---|---|
Backfilling with Native Soil | $1.50 - $3.00 per cubic yard |
Backfilling with Gravel | $25 - $40 per cubic yard |
Labor for Trench Backfilling | $50 - $75 per hour |
Equipment Rental (e.g., Backhoe) | $200 - $300 per day |
Permit Fees | $50 - $100 |
Disposal of Excess Material | $30 - $50 per truckload |